Lonmin’s overall platinum group metal output slumped by 31.1%. in the three months to December 31 due to smelter shut-downs.  However, the company was able to record 9% higher sales to 146 890 ounces and 11.7% higher overall PGM production to 274 425 ounces.

Lonmin’s platinum major is maintaining its forecast of 730 000 ounces for the year and reducing its capital expenditure (capex) from $250-million to $185-million.

Q1 underground production was the highest the since 2011 and saleable metal-in-concentrate of 200 170 ounces is the highest since 2007. Concentrator recoveries in Q1 were lower at 87.1%.

The closure of the leaking Number One furnace for repair lowered refined Q1 output by 28.8% to 139 823 oz and total PGM production fell to 265 128 oz.The Number Two furnace is also down because of electrode breaks.

CEO Ben Magara, said in a media release, “we’re making good progress with repairs.”

Lonmin has been fatality free for the fourth successive quarter and its lost time injury frequency rate for the 12 months to December 31 improved by 2.7% to 3.58 incidents a million person hours compared with 3.69 in 2013.

Production update
Mining operations at Marikana underground produced 2.7-million tonnes during the first quarter, an increase of 7.9%, or 0.2-million tonnes on the prior year period.

Production at Westerns was 1 045 000 tonnes, an increase of 3%, and the second largest Rowland shaft, increased production by 1.4%.

Production at Karee was 1 124 000 tonnes, with the biggest K3 shaft increasing production by 8.2%.

The Newman shaft delivered a 9% increase and the Hossy shaft a 4.9% increase.

Production at Easterns rose 22.3% and production at Saffy shaft rose 30.1%.

Production at Pandora rose 30.5% and production at Merensky opencast operations was 28.2% lower than the prior year period as this operation is reaching the end of its life.

Total tons milled in Q1 increased by 9.5% to 3.1-million tons and the underground milled head grade increased slightly to 4.55 g/t.

The company is confident of managing its working capital requirements through cost conservation measures and capital discipline.

 

Additional Reading?