Lonmin, the world’s third largest platinum producer, revealed in its production report that its operations delivered a solid performance in the second quarter.

The company explained that towards the end of Q2 it experienced the re-emergence of Section 54 safety stoppages and management induced safety stoppages as well as intermittent labour disruptions.

As a result, total tons mined was 2.8 million t, down 4.3% on the prior year period and 4.7% on Q1 2013.

Total tons mined in the Q2 of the 2013 financial year from Marikana underground operations were 2.6 million t, a decrease of 179 000 t or 6.5% from the prior year period.

Lonmin said that the decrease was mainly a result of the anticipated ramp up in production following the Marikana events notwithstanding the ramp up exceeding expectations the resurgence of Section 54 safety stoppages (resulting in 62 000 t of lost production) and labour disruptions.

Further, production at the Karee operations decreased by 38 000 t or 3.0% on the prior year period as a result of the loss in production from Section 54 safety stoppages and machine breakdowns which constrained production in the UG2 area, as well as the planned non-contribution from K4, which added 25 000 t in the prior year quarter.

Lonmin However pointed out that these difficulties were mitigated by the continued momentum at the K3 shaft.

Meanwhile, Westerns‘ production declined by 50 000 t or 6.7% with 12 000 t lost to labour disruptions. The company noted that the balance was due to the planned continued depletion of reserves at Newman and ore reserve and infrastructure challenges at Rowland around hoisting logistics. A pilot project around de-bottlenecking has commenced to address the hoisting constraints and improve production at Rowland, Lonmin revealed.

Middelkraal registered a 15 000 t or 3.0% decline due to a slight loss in traction at Saffy, partly as a result of the Section 54 safety stoppages and management induced safety stoppages that occurred during the quarter.

Lonmin said that its Easterns operation declined by 76 000 t of production or 26.8% when compared to the prior year period primarily due to losses from Section 54s at E2 and E3, which accounted for around 20 000 t, as well as labour disruptions and the continued planned decline at E1.

Production at Lonmin’s Merensky opencast operations in the period was 133 000 t, an increase of 55 000 t or 69.7% when compared to the prior year period following interventions to stabilise grade and implement best practice methods to optimise production. The production from Pandora remained flat at 51 000 t.

Lonmin noted that the total lost production due to Section 54 safety stoppages, most of which were lost in March 2013, was 82 000 t. This compares to 170 000 t lost in the prior year period. An additional 27 000 tonnes of production was lost as a result of management induced safety stoppages, compared to 31 000 t in the prior year, and a further

31 000 t of production was lost mainly as a result of labour unrest at Westerns, opencast operations and joint ventures.

Process Division

Lonmin reported that total tons milled in the Q2 was 2.8 million, a decrease of 4.8% from the prior year, owing to building stocks after the Christmas break and the Number One UG2 concentrator being taken down at the start of the financial year for planned capacity upgrades.

The company advised that the UG2 concentrator is due to come back online in the Q4 of FY 2013. The capacity constraint was mitigated by higher milling rates and improved availability at the other plants.

Underground milled head grade in the quarter was 4.62g/t (5PGE+Au), up 0.16 grammes per ton or 3.5% compared to the prior year period. The opencast grade was 2.89g/t, a 7.8% improvement on the prior year period. The overall milled head grade was 4.54g/t, an increase of 4.1% when compared to the prior year period, benefitting from a 1.6% increase in mined UG2 as well as continued focus on quality factors and stabilising opencast production and grade.

Lonmin said that underground and overall concentrator recoveries reached 86.8% in the quarter, an improvement of 1.4% or 1.2 percentage points when compared to the Q2 of the 2012 financial year.

Sales & Pricing

The platinum producer advised that sales for the Q2 of the 2013 financial year were 217 800 platinum ounces and 404 176 PGM ounces, with platinum sales being 3.4% lower than the prior year period and PGMs 3.5% lower.

The US dollar basket price including base metal revenue at US$1 244 per PGM ounce was 1.3% higher than the prior year quarter. The corresponding rand basket price at R11 109 was 17.4% higher than the prior year period driven by the weaker rand.

Lonmin announced that its rolling average Lost Time Injury Frequency Rate (LTIFR) for the quarter of 3.66 incidents per million man hours compared to 4.69 for Q2 2012 and 3.74 for Q1 2013.

The company experienced two fatalities in April 2013, terming the incidents unacceptable and revealing that management is focused on embedding the behavioural competencies that underpinned the safety achievements recorded in the first half of the financial year by the company.