ASX-listed Uranex has released its quarterly report for the period ended 30 June 2013.

OPERATIONS

Tanzania

The exploration programme for this year ramped up significantly during the quarter

once the access to tenements became easier following the wet season. The main

focus for the quarter has been the commencement of the trenching programme at the 100% owned Nachu graphite tenement in south-east Tanzania.

Johan Erasmus, Badger Mining and Consulting, Johannesburg, joined the team as a contract exploration manager on a part time basis. Erasmus will assist the Tanzanian team and also act as the competent person for ASX announcement purposes.

While the initial focus has been to progress Nachu, it is expected that further

exploration will be commenced on other tenements where some gold, base metal and coal anomalies were discovered in the regional exploration programme in 2012.

Nachu Graphite

After the initial indications of graphite mineralisation were found as part of the regional exploration programme in late 2012, further exploration visits were made in February and April 2013 resulting in the discovery of more mineralised outcrops.

These visits indicated to the company that there was potentially a significant graphite resource on this tenement and that further investigation was warranted. Outcrop samples were taken which showed a potential mineralisation strike length of 19km and outcrops were also indicating a mixed assemblage of mineralised zones over 1km in width across strike. Indications of dip is approximately 20 degrees to the

West.

A programme of trenching and pitting commenced in June 2013 with the initial aim of confirming the width of mineralisation across the interpreted strike of the anomaly, determined from the outcrop sampling. The first of these trenches was nearing completion at the end of the quarter and showed 701m of mineralised

graphitic schists from the first 930m of trenching.

This was an excellent result, as there were wide intersections of graphite mineralisation confirmed which indicated the possibility for a significant near surface resource. In addition, the dip of the zones were confirmed as approximately 17 degrees

Rutamba North

A short visit was made to this tenement during the quarter however, as expected, the density of vegetation following the wet season prevented any further exploration. This tenement is also quite remote with the nearest road some 6km from where the initial indications of coal were found.

OTHER TENEMENTS

No work was conducted on other tenements during the quarter due to the focus on Nachu.

Songea Coal Project (Uranex 100%)

The Songea Coal Project is in the south west of Tanzania. With the increase in tenement rents during 2012 the Board has resolved to allow some of these tenements to expire at their 2013 renewal date.

There are three key reasons for the decision:

1. From the 2012 exploration programme and following a recent review by a Tanzanian Geology consultant, some of the tenements are favourable for coal but at significant depths. This infers that more expensive exploration programmes would be needed to discover the coal and are probably beyond the company’s resources at this time. Whilst discussions have been held with several groups regarding joint ventures no group has expressed any interest so far. This is primarily due to the current lack of investor interest in coal

2. The current lack of infrastructure such as the rail link to the coastal ports means that any production would be limited to local consumption and there are several projects either in production or near to production that should satisfy this demand.

3. The significant prospects at Nachu for a project development means the company will have major focus on this project for some time.

No work was undertaken on these tenements during the quarter.

Manyoni Uranium Project (Uranex 100%)

The Manyoni Uranium Project located in central Tanzania is host to 29Mlbs U3O8 at 100ppm cut off. The project is subject to on-going evaluation of the potential to increase the resource and of the potential to improve metallurgical recoveries.

During the quarter the sample storage yard at Manyoni was closed with much of the old samples from the 2008 trenching and pitting exploration buried in one of the Mbugas from where most of the samples originated. Any samples from the sonic core programme will be stored at the Mkuju camp for reference.

The return of these samples to the Mbuga followed all appropriate procedures and approval was obtained from the relevant government and community groups.

AUSTRALIA

Thatcher soak Project (Uranex 100%)

The Thatcher Soak Project is located within the main Yilgarn calcrete province in Western Australia.

Other deposits in this province include Yeelirrie, Lake Way, Centipede and Lake Maitland. No further work was completed this quarter.

Bremer Basin (Uranex 100%)

The Bremer Basin tenements were fully relinquished during the period

Alligator Rivers (Uranex 100%)

The Alligator Rivers project is located in the Northern Territory Pine Creek Geosyncline, which hosts world class uranium deposits such as Ranger, Nabarlek and Jabiluka. The Company’s tenements incorporate a number of key geological elements considered favourable for the formation of unconformity-style mineralisation that typify the above major uranium deposits.

No work was conducted on the Love Creek Tenement during the quarter.

Swim Creek Join Venture Agreement

The company has entered into a joint venture agreement with Rum Jungle Resources Ltd (RUM) in respect to the Swim Creek Tenement in the Alligator Rivers region of the Northern Territory.

Under the agreement RUM can earn up to a 70% interest in the joint venture following expenditure of $500,000 over a three year period.

No significant work was conducted in the quarter however a drill programme is planned by RUM for later in the year.

CORPORATE

Options Issue

A rights issue, offering an option, subscribed for at 1 cent, for every one share held was announced in April 2013 and closed in mid-May 2013.

The shortfall, after the initial uptake, was largely placed with retail investors, the total capital raised was $1.707 million by the end of the quarter. Commitments are in place for the remainder of the shortfall $0.29 million to be taken up in July 2013.

This was an excellent result for the company and allows the company to continue exploration on the exciting Nachu Graphite project.

Company Staffing

A reduction in staff levels in Tanzania and Australia was completed during the quarter. This reduction, although regrettable, was seen as essential to meet the needs of the company for the next two years.

The level of exploration anticipated during 2013 and into 2014 is much less than previous years, when large drilling programs were undertaken on the Mkuju Uranium Project, hence the need for staff has significantly reduced. Voluntary redundancy packages were offered and accepted by all but two of those retrenched.

The Australian office now comprises the CEO, CFO/Company Secretary on a full time basis and the Sustainability / Compliance Manager on a part time basis.

The Tanzanian exploration team now consists of two geologists supported by a part time contract geologist from South Africa and four technicians. The total number of employees in Tanzania including office staff in Dar es Salaam is now 11.

When short term roles are required they will be offered to retrenched employees as a first option.