The ramp-up at Northam’s Booysendal mine, which came into production on 1 July 2013, continues. Mining averaged 102 000 tonnes/month, the platinum producer reported in its results for the six months ended 31 December 2013.

However, the mill throughput was significantly higher at 145 000 tonnes/month, supplemented by the surface stockpile in order to produce as much metal as possible to mitigate the effect of the strike at Zondereinde.

Surface stockpile

At 31 December 2013, the surface stockpile contained 197 000 tonnes of run-of-mine (ROM) ore. Total tonnes milled in the six months amounted to 870 072.

This strategy of adding stockpile tonnes to the mill resulted in unit costs for the period being artificially low. This will normalise as run of mine tonnages build up from underground.

Cost performance

A more realistic impression of Booysendal’s cost performance will become apparent once the mine ramps up to steady state production and the initial stockpile is depleted.

Booysendal recorded an operating loss of R131 million for the reporting period. Capital expenditure in the first half of F2014 was R270.1 million (H1 F2013: R761.8 million).

Underground capital footprint

A further R314.6 million is expected to be spent in the remainder of the financial year on the underground capital footprint.

Since inception, the total capital expenditure for the development of Booysendal mine is R4.3 billion, against a projected total expenditure of R4.6 billion. The original capital budget for Booysendal was R3.9 billion in June 2010 terms.