The Waterberg Coal Joint Venture Partners (WCJVP) has completed a feasibility study into the development of an opencast mining operation to produce 10 million tonnes of coal per annum for Eskom for an initial term of 30 years.

The study has been carried out on the resources that reside within two tenements, namely Smitspan 306LQ and Masssenburg 305LQ.

These are two of four tenements held under a Mining Right granted by the Department of Mineral Rights.

The estimated proven reserves contained within the study are 283.75 million tonnes of product, with probable reserves of 18.07 million tonnes, as confirmed by SRK Consulting.

The geotechnical investigation, concluded by Coffey Mining, included the geotechnical aspects of both the mining and infrastructure for the study.

The production volume requirements of the WCJVP mine dictate that a massive mining method be applied. The project will employ a truck and shovel fleet for waste and coal mining.

Additional Reading?

Request Free Copy